Dual 300,000 gallon potable water tanks and the process water building system
Author Archives: jennifer
Elan Control Room Reconfiguration – Gainesville, GA
Project included construction of a new pharmaceutical production area
Ethicon Monofilament Reconfiguration
Project included a plant reconfiguration in order to allow for new production lines
Great Skate Skating Rink
Construction of a 20,000 square-foot recreational facility.
Cumming Aquatic Center
Design and construction of the pre-engineered metal building system
Elan Administrative Office Reconfiguration – Gainesville, GA
Renovation of approximately 4600sf…
Elan GMP Gowning Upgrade – Gainesville, GA
This project included the interior reconfiguration of three different areas
Ethicon Facade and Drainage Upgrades – Cornelia, GA
This project included the demolition of the outdated façade…
The Breast Center at Longstreet Clinic
Medical interior in Gainesville, Georgia
Georgia Mountains Center Parking Deck
Public parking structure built for the City of Gainesville
McCollum Field Development
This project included the construction of eighteen hangars, a new taxiway and a new parking lot.
Silverton Bank Hangar Facility and Office
36,000 square-foot aircraft hangar and office facility
Cleveland Jet Center
26,500 square-foot aircraft hangar construction and terminal renovation