Author Archives: jennifer

Potable Water Storage Facilities System and Site Hardening

Dual 300,000 gallon potable water tanks and the process water building system

Elan Control Room Reconfiguration – Gainesville, GA

Project included construction of a new pharmaceutical production area

Ethicon Monofilament Reconfiguration

Project included a plant reconfiguration in order to allow for new production lines

Great Skate Skating Rink

Construction of a 20,000 square-foot recreational facility.

Cumming Aquatic Center

Design and construction of the pre-engineered metal building system

Elan Administrative Office Reconfiguration – Gainesville, GA

Renovation of approximately 4600sf…

The Longstreet Clinic Central Laboratory

The Longstreet Clinic Pharmacy

Spherion Gainesville

Interior tenant build-out of 3rd floor

Elan GMP Gowning Upgrade – Gainesville, GA

This project included the interior reconfiguration of three different areas

Ethicon Facade and Drainage Upgrades – Cornelia, GA

This project included the demolition of the outdated façade…

Pro Therapy Sherwood Park Drive

Interior tenant build-out

The Breast Center at Longstreet Clinic

Medical interior in Gainesville, Georgia

Georgia Mountains Center Parking Deck

Public parking structure built for the City of Gainesville

McCollum Field Development

This project included the construction of eighteen hangars, a new taxiway and a new parking lot.

Silverton Bank Hangar Facility and Office

36,000 square-foot aircraft hangar and office facility

Longstreet Cancer Center Gainesville

A 13,077 square-foot interior build-out

Cleveland Jet Center

26,500 square-foot aircraft hangar construction and terminal renovation